- Home
- Density Test Report Report ID: 63902
- This project is inactive from admin.Download Report
Density Test Report
Date :02/01/2024
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :02/01/2024 13:00
Onsite Hours :03:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :02/01/2024 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
02/01/2024 | 1 | 19.7 | 102.3 | 24208 | 110.4 | 16.3 | 92.7 | 90 | D6938 | Pass |
Location : | Roadway in front of Lot #13, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :1 | |||||||||
02/01/2024 | 2 | 17.1 | 100.3 | 24208 | 110.4 | 16.3 | 90.9 | 90 | D6938 | Pass |
Location : | Roadway in front of Lot #14, Elv/Depth :3 feet below finished grade | |||||||||
Comment : | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, February 1, 2024
Reviewer Name / DateKenneth Mosman, March 11, 2024