Skip to content

Density Test Report

Date :01/29/2024
Project No :2023C111
Client Company :2MATL
Arrival Time :01/28/2024 22:00
Onsite Hours :08:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :windy/ clear night
Departure Time :01/29/2024 06:00
ASEC Technician Name :Isaac Davis

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/29/2024 01 33.6 87.6 brown sandy silt 0 Infinity 80 D6938 Pass
Location : , Elv/Depth :Top Lift
Comment : Had the contractor run the trench roller over more to meet the specifications. Gauge Serial No. :
01/29/2024 02 30.8 91.6 Brown sandy silt 0 Infinity 80 D6938 Pass
Location : , Elv/Depth :Top lift
Comment : Passing Specifications. Contractor Placing back the same compaction or high from first initial tests. Gauge Serial No. :
Technician Signature / DateIsaac Davis, January 29, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024