Skip to content

Density Test Report

Date :01/19/2024
Project No :2023C141
Client Company :Toll Bros
Arrival Time :01/19/2024 9:00
Onsite Hours :04:00
Name of the Project :N. Gate - Old Atlanta Road
Project Location :Cumming
Weather :sunny
Departure Time :01/19/2024 13:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
01/19/2024 1 27.6 96.1 24469 103.9 18.7 92.5 90 D6938 Pass
Location : Trench under roadway location shown in pictures, Elv/Depth :15 feet below finished grade
Comment : Gauge Serial No. :85759
01/19/2024 2 20 104.6 24468 111.3 17.5 94.0 90 D6938 Pass
Location : Trench under roadway location shown in pictures, Elv/Depth :18 feet below finished grde
Comment : Gauge Serial No. :85759
01/19/2024 3 27 96.1 24469 103.9 18.7 92.5 90 D6938 Pass
Location : Trench under roadway location shown in pictures, Elv/Depth :12 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, January 19, 2024
Reviewer Name / DateKenneth Mosman, March 10, 2024