Skip to content

Daily Field Report

Date :12/22/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/22/2023 8:00
Onsite Hours :04:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/22/2023 12:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services.  Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

  • The placement and compaction of backfill soils for the water storm trench between MH 1E to MH1F and MH1G, continued this day.
  • At the time of arrival, our representative observed that work was in progress with one (1) foot lifts being placed, compacted using a sheeps-foot compactor.
  • Density test results indicate that the compacted materials met the project requirement of 90% of the maximum dry density obtained by the (Standard Proctor ASTM 698).
  • Observed the placement of 72 cubic yards of 3000 psi concrete for footing of retaining wall 10.

Technician Signature / DateAminullah Azimi, December 22, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024