Skip to content

Density Test Report

Date :12/12/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :12/12/2023 11:00
Onsite Hours :06:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :sunny
Departure Time :12/12/2023 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
12/12/2023 1 19.2 100.4 24209 111.6 16.5 90.0 90 D6938 Fail
Location : 49 feet to west of MH 9H., Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
12/12/2023 2 18.5 105.2 24209 111.6 16.5 94.3 90 D6938 Pass
Location : 125 feet to west of MH 9H., Elv/Depth :4 feet below finished grade
Comment : Gauge Serial No. :85759
12/12/2023 3 20.8 102.8 24209 111.6 16.5 92.1 90 D6938 Pass
Location : 41 feet to west of MH 9H., Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
12/12/2023 4 17.1 106.4 24209 111.6 16.5 95.3 90 D6938 Pass
Location : 118 feet to west of MH 9H., Elv/Depth :3.5 feet below finished grade
Comment : Gauge Serial No. :85759
12/12/2023 5 16.8 123.9 24209 111.6 16.5 95.1 90 D6938 Pass
Location : 152 feet to east of MH 9I., Elv/Depth :4.5 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, December 12, 2023
Reviewer Name / DateKenneth Mosman, March 09, 2024