- Home
- Daily Field Report Report ID: 63164
- Edit Download Report
Daily Field Report
Date :11/29/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :11/29/2023 12:00
Onsite Hours :04:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :Sunny
Departure Time :11/29/2023 16:00
ASEC Technician Name :Vidal Dias
Observations/Finding
On 11/29/2023, the undersigned ASEC representative visited the site to observe the ongoing placement of the sewer line along Road ‘C’. This visit was part of our continued effort to observe and document the progress infrastructure installations as per project requirements.
Sewer Line Installation Observations:
- The focus of the visit was the sewer line installation process along Road ‘C’. The operation was observed for its adherence to project plans and specifications.
- Piping appeared to be installed in accordance with the project drawings.
- Backfilling operations were also observed. The trench was backfilled in six to eight-inch lifts and compacted.
Compaction and Testing:
- Compaction tests were performed on the compacted backfill material.
- A probe rod was used in conjunction with density testing equipment to verify stability of surficial soils. The probe rod did not exceed two inches in deflection.
Test No. | Dry Density (pcf) | Moisture Content (%) | Wet Density (pcf) | Compaction (%) |
---|---|---|---|---|
1 | 86.4 | 31.0 | 113.1 | 98.4 |
2 | 86.6 | 30.9 | 113.4 | 98.6 |
3 | 86.9 | 31.0 | 113.8 | 98.9 |
4 | 87.1 | 30.8 | 114.0 | 99.2 |
5 | 87.3 | 31.0 | 114.3 | 99.4 |
6 | 87.5 | 30.9 | 114.5 | 99.6 |
7 | 87.6 | 31.0 | 114.7 | 99.8 |
If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have.
Technician Signature / DateVidal Dias, November 29, 2023
Reviewer Name / DateKenneth Mosman, January 02, 2024