Daily Field Report
Date :11/29/2023
Project No :2023C201
Client Company :Artisan Built Communities
Arrival Time :11/29/2023 08:00
Onsite Hours :04:00
Name of the Project :Jasons Walk - Era Drive
Project Location :Era Drive, Cumming, GA
Weather :Partly Cloudy
Departure Time :11/29/2023 12:00
ASEC Technician Name :Vidal Dias
Observations/Finding
The undersigned ASEC representative visited the site to observe the ongoing construction activities. The primary focus was on the backfilling of the trench, compaction testing, and the installation of new pipe sections.
Trench Backfill and Compaction
- Activity Observed: Backfill of the trench for storm drain installation.
- Method: The contractor backfilled the trench in 6 to 8-inch lifts.
- Compaction Tests: Six compaction tests were performed to ensure compliance with project specifications.
- Location: The area of backfill is shown in red on the attached site drawing.
Pipe Installation Progress
- Location: Stretching from Ava Court towards the intersection with Austin Michael Lane.
- Activity Observed: Excavation and laying of new storm pipe sections.
- Method: The contractor coordinated excavation and pipe laying operations.
- Location: The area where the new pipe was being placed is shown in blue on the attached site drawing.
- Compliance: All activities observed were in accordance with the project specifications and standards.
If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have. We appreciate the opportunity to contribute to the project.
Technician Signature / DateVidal Dias, November 29, 2023
Reviewer Name / DateKenneth Mosman, March 08, 2024