- Daily Field Report Report ID: 63082
- Edit Download Report
Daily Field Report
Date :11/16/2023
Project No :2021C002
Client Company :CW Matthews
Arrival Time :11/16/2023 8:00
Onsite Hours :05:00
Name of the Project :Runway 9L End Around Taxiway
Project Location :HJAIA
Weather :sunny
Departure Time :11/16/2023 13:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
The installation of the 30 inches of water line was observed between STA 7028+00 to 7030+00 prior to backfill placement.
Technician Signature / DateAminullah Azimi, November 16, 2023
Reviewer Name / DateKenneth Mosman, January 02, 2024