- Home
- Daily Field Report Report ID: 63044
- Edit Download Report
Daily Field Report
Date :11/14/2023
Project No :2022C218
Client Company :CW Matthews
Arrival Time :11/14/2023 8:00
Onsite Hours :9:30
Name of the Project :Ramp 20 Pavement Replacement - IFB-1230102
Project Location :HJAIA
Weather :sunny
Departure Time :11/14/2023 17:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- performed straight edge for Ramp 20 Phase 4, from lanes 1 to 17 and phase 5 from lanes 1 to 7 and coring for phase 4 and 5.
- sampling of concrete of beams for ramp 20 phase 4 and phase 5. spalls.
- placement of backfill GAB for the end around between STA 7019 to STA 7021+50 in the time arrival already compacted. Density testing was performed using a Troxler nuclear gauge (#3430, serial #85759). Test results indicated that the compacted material met project requirement of 95% of the maximum dry density.
Technician Signature / DateAminullah Azimi, November 14, 2023
Reviewer Name / DateKenneth Mosman, December 12, 2023