Daily Field Report

Date :11/15/2023
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :11/15/2023 08:00
Onsite Hours :04:00
Name of the Project :Lakeside
Project Location :Calhoun
Weather :Sunny
Departure Time :11/15/2023 12:00
ASEC Technician Name :Vidal Dias

Observations/Finding

On November 15, 2023, the undersigned ASEC representative visited the Lakeside Development site. The purpose of the visit was to inspect the undercutting of topsoil materials in Lots #68, 69, 70, and 71, and to evaluate surficial soils adjacent to Lots #34 through 37, which were in question by the contractor.


Inspection and Findings

Undercutting of Topsoil in Lots #68, 69, 70, and 71

  • The topsoil material depths in these lots were visually inspected quantity.
  • The undercutting areas are shown in red on the attached drawing.

Evaluation of Soils Behind Lots #34 – 37

  • The soils in this area were observed to be tan to brown, Silty fine to medium, and Sand.

Excavation of Large Boulders

  • Large boulders were excavated from the road in the area highlighted in yellow on the attached drawing.

 

Technician Signature / DateVidal Dias, November 15, 2023
Reviewer Name / DateKenneth Mosman, January 02, 2024