Daily Field Report

Date :10/27/2023
Project No :2022C218
Client Company :CW Matthews
Arrival Time :10/27/2023 8:00
Onsite Hours :07:00
Name of the Project :Ramp 20 Pavement Replacement - IFB-1230102
Project Location :HJAIA
Weather :sunny
Departure Time :10/27/2023 15:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • A proof-roll observation was performed in the Ramp 20, phase 4 area, southwest of lane 16 and line 17 Approximately (50’x160)’ A fully loaded tandem-axle truck was used to proof-roll the above-mentioned subgrade with multiple passes.  Severe yielding and deflection were not observed during the proof-roll at all areas mentioned above.
  • Our representative along with Thamos of ATLQA observed the proof-roll.
  • Graded Aggregate Base was being prepped for CTB use.
  • Finished installing under drains in all Phase 4,

In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.

 

Technician Signature / DateAminullah Azimi, October 27, 2023
Reviewer Name / DateKenneth Mosman, November 12, 2023