Date :10/23/2023
Project No :2022C165
Client Company :Toll Bros. Inc.
Arrival Time :10/23/2023 8:30
Onsite Hours :05:30
Name of the Project :Northfield @ Polo Fields - Phase2
Project Location :Pittman Road, Cumming, GA
Weather :sunny
Departure Time :10/23/2023 14:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to verify compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- performed a proof-roll on subgrade soils, for the road east of Lots #13 to 19 and the shoulder on the east of project (locations highlighted red in attached photos). Grading appeared to be at finished grade elevation based on the information. A fully loaded tandem axle truck was used to proof-roll the above-mentioned subgrade with multiple passes across the area.
No yielding and deflection were observed during the proof-roll at all areas mentioned above.
In case of any questions or concerns with regards to our observations or recommendations stated in this report we will be more than glad to discuss them with you.
Technician Signature / DateAminullah Azimi, October 23, 2023
Reviewer Name / DateKenneth Mosman, November 04, 2023