Daily Field Report
Date :09/28/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/28/2023 09:30
Onsite Hours :07:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :Clear skies
Departure Time :09/28/2023 16:30
ASEC Technician Name :Ramchandra Mogulla
Observations/Finding
The above mentioned AS Engineering and Consulting (ASEC) representative, visited the Carodel Farms site to conduct quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site:
- Rock Volume Determination for the blast performed on this date: Rock volume was determined based on the attached drill logs. Drilling was performed on the days leading up to today and depths to top of rock and termination was recorded.
- The total quantity of mass rock shot on this day was calculated to be 1580.70 cubic yards.
- The total quantity of trench rock shot on this day was calculated to be 1501.11 cubic yards.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateRamchandra Mogulla, September 28, 2023
Reviewer Name / DateKenneth Mosman, November 04, 2023