- Home
- Daily Field Report Report ID: 62627
- Edit Download Report
Daily Field Report
Date :10/16/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :10/16/2023 08:00
Onsite Hours :
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :Sunny
Departure Time :
ASEC Technician Name :
Observations/Finding
On October 16, 2023, Vidal Dias of AS Engineering and Consulting visited the site to observe soil placement activities for the construction of the dam. The contractor was using different types of soils along sections of the dam.
Soil Observations
A tan, brown, micaceous sandy silt was being placed along the southern slope of the dam, while red, slightly micaceous sandy clay was used for the center of the dam.
Compaction Test Results
Test No. | Wet Density (pcf) | Dry Density (pcf) | Moisture Content (%) | Approx. Elevation | Compaction (%) |
---|---|---|---|---|---|
1 | 128.2 | 83.8 | 34.9 | 1104 | |
2 | 127.5 | 83.1 | 35.0 | 1104 | |
3 | 134.2 | 87.5 | 35.4 | 1104 | |
4 | 130.5 | 85.3 | 34.7 | 1105 | |
5 | 133.8 | 87.1 | 35.2 | 1105 | |
6 | 126.2 | 82.6 | 34.4 | 1105 | |
7 | 129.7 | 84.7 | 34.6 | 1105 |
If you have any questions or require further clarification regarding the content of this report, please do not hesitate to get in touch. We are readily available to address any inquiries you may have.
Technician Signature / DateVidal Dias, October 16, 2023
Reviewer Name / DateKenneth Mosman, November 04, 2023