Daily Field Report

Date :10/10/2023
Project No :2023C195
Client Company :Toll Bros. Inc.
Arrival Time :10/10/2023 08:00
Onsite Hours :08:00
Name of the Project :Kimbal Bridge Tract
Project Location :Alpharetta
Weather :Sunny
Departure Time :10/10/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

On October 10, 2023, Vidal Dias from AS Engineering and Consulting conducted a site visit to Kimball Bridge Road to perform geotechnical observations for the planned dam in detention pond area 2. The soil being placed consisted of a red slightly micaceous sandy clay. The material was laid in 8-inch lifts and compacted.

To further evaluate the conditions, four proof-rolls were performed using a loaded dump truck. Observations led to recommendations for the contractors to remove any organic material, particularly tree roots larger than 3 inches in diameter, to enhance the subgrade’s integrity.

The following chart outlines the seven compaction test results:

Test No. Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Elevation
1 131.5 85.6 35.3 1092
2 130.0 85.0 34.8 1093
3 132.2 86.3 34.7 1094
4 129.5 84.9 34.5 1095
5 128.8 84.5 34.4 1095
6 127.2 83.9 34.2 1095
7 126.5 83.6 34.0 1096

Please don’t hesitate to contact us if you have any questions.

Technician Signature / DateVidal Dias, October 10, 2023
Reviewer Name / DateKenneth Mosman, November 04, 2023