Observations/Finding

The above-mentioned AS Engineering and Consulting (ASEC) representative, visited the River Walk Manor site to conduct quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals.

The following observations were made on-site:

  • Rock Volume Determination for the blast performed on this date: Rock volume was determined based on the attached drill logs. Drilling was performed on the days leading to today and depths to top of rock and termination was recorded.
  • The total quantity of mass rock shot on this day was calculated to be 4248.5 cubic yards.

We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.

Technician Signature / DateRamchandra Mogulla, July 27, 2023
Reviewer Name / DateKenneth Mosman, October 22, 2023