Daily Field Report
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)
1. The geo-fabric has been placed on the half side of the basement.
2. One thousand two hundred and twenty-four (1,223.65) tons of 825-B material has been placed and hauled.
3. No tests have been performed.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Stone has been placed in basement
Geo-fabric is placed on the basement
Spreading of Geo-fabric in basement