AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)
- Hauling in the Basement was performed in section 1 for a lift (10) and Section 2 for a lift (14).
- Transportation of clay materials has been stopped because basement has been filled with an elevation of 280 ft.
- No tests have been performed on this day.
- Poured and filled the HDPE pipe with flowable fill.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Leveling the fill material using the Dozer
Leveling the fill material using the Dozer
Poring the flowable fill in the HDPE pipe
Poring the flowable fill in the HDPE pipe
Monitoring the flow-fill by Terry
Completely filled HDPE pipe with Flow-fill