Date :09/13/2023
Project No :2023C180
Client Company :Artisan Communities
Arrival Time :09/13/2023 10:00
Onsite Hours :04:00
Name of the Project :Lakeside
Project Location :Calhoun
Weather :Sunny
Departure Time :09/13/2023 14:00
ASEC Technician Name :Vidal Dias

Observations/Finding

The undersigned ASEC representative was on-site on September 13, 2023, to evaluate soil conditions in the site’s southern portion, specifically where the road is planned to be constructed and to perform compaction testing on Lots #1 and #2.


Soil Description for Area of Road Construction

The remediated soil area designated for road construction was measured to be 25 feet by 40 feet to a depth of 10 feet.

Volumetric Analysis for Area of Road Construction

  • 25 ft×40 ft×10 ft=10,000 ft3

Engineering Recommendations for Area of Road Construction

It was recommended that the area be backfilled in six-inch lifts and compacted using the 815 compactor.


Compaction Test Data for Lots 1 and 2

Test Location and Elevation

  • Elevation: 725 feet
  • Depth below grade: 1.5 feet

Soil Description

  • Light Tan Sandy CLAY

Laboratory Data (Moisture-Density Relationship)

  • Maximum Dry Density: 97.0 pcf
  • Optimum Moisture: 19.1%

In-Field Data

Test 1

  • Moisture: 20%
  • Dry Density: 96.6 pcf
  • Wet Density: 110.2 pcf
  • Degree of Compaction: 99.6%

Test 2

  • Moisture: 21.3%
  • Dry Density: 93 pcf
  • Wet Density: 111 pcf
  • Degree of Compaction: 95.9%

Technician Signature / DateVidal Dias, September 13, 2023
Reviewer Name / DateKenneth Mosman, September 24, 2023