- Home
- Daily Field Report Report ID: 61799
- Edit Download Report
Daily Field Report
Date :09/19/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :09/19/2023 8:00
Onsite Hours :07:00
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :09/19/2023 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
The above mentioned AS Engineering and Consulting (ASEC) representative, visited Riverwalk Manor site to perform quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site:
The following observations were recorded during the shift:
- Our representative observed the drilling of rock and verified the accuracy of the top of rock and termination depths at west of Lot#406.
- The resulting volumes were calculated and are presented in a separate report, which is dated in conjunction with the blast day for reference.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAminullah Azimi, September 19, 2023
Reviewer Name / DateKenneth Mosman, September 24, 2023