- Home
- Daily Field Report Report ID: 61731
- This project is inactive from admin.Download Report
Daily Field Report
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)
During the visit, the following observations were made:
- Two thousand five hundred and twenty (2520) cubic yards of fill materials were received for lift (12) in section 2 basement area B7 (E720659 S1-R8).
- The basement area was probed using the hand probe and two moisture density test were performed in the basement followed with a check-plug to verify Proctor curve application. The test locations were marked on the enclosed drawing.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Highlighted region shows
Placement of structural fill materials in section 2
Placement of structural fill material in section 2
Hauling in the section 2
placed the structural fill materials in Section 2