- Home
- Daily Field Report Report ID: 61538
- This project is inactive from admin.Download Report
Daily Field Report
Date :08/07/2023
Project No :2023C144
Client Company :CCG
Arrival Time :08/07/2023 09:30
Onsite Hours :07:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :Sunny
Departure Time :08/07/2023 16:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
The above mentioned AS Engineering and Consulting (ASEC) representative, visited the Carodel Farms site to conduct quality control inspection and testing services. Visual observation techniques were employed to ensure compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were made on-site:
- Rock Volume Determination for the blast performed on this date: Rock volume was determined based on the attached drill logs. Drilling was performed on the days leading to today and depths to top of rock and termination was recorded.
- The total quantity of rock shot on this day was calculated to be 3371.93 cubic yards (mass rock).
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateRamchandra Mogulla, August 7, 2023
Reviewer Name / DateKenneth Mosman, September 15, 2023