Density Test Report

Date :09/13/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :09/13/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :09/13/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
09/13/2023 4 16.1 109.6 ASEC-2 110.9 15.3 Check
Location : Section 2 basement area G7 , Elv/Depth :276
Comment :
09/13/2023 1 17.6 106.5 ASEC-2 110.9 15.3 96.0 95 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :278
Comment : Gauge Serial No. :30942
09/13/2023 2 16.2 105.5 ASEC-2 110.9 15.3 95.1 95 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :277
Comment : Gauge Serial No. :30942
09/13/2023 3 15.7 105.3 ASEC-2 110.9 15.3 95.0 95 D6938 Fail
Location : Section 2 basement area G7 , Elv/Depth :276.5
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, September 13, 2023
Reviewer Name / DateRamchandra Mogulla, September 25, 2023