Date :09/12/2023
Project No :2023C144
Client Company :CCG
Arrival Time :09/12/2023 8:00
Onsite Hours :9:00
Name of the Project :Carodel Farms @ Union Church Rd
Project Location :Flowery Branch
Weather :sunny
Departure Time :09/12/2023 17:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.

The placement and compaction of backfill soils for Lots #50, 51 and 52, continued this day.

At the time of arrival, our representative observed that work was in progress for lots with one (1) foot lifts being placed at finished grade and compacted using a 15-ton compactor.

Density test results indicate that the compacted materials met the project requirement of 95% of the maximum dry density.

Technician Signature / DateAminullah Azimi, September 12, 2023
Reviewer Name / DateKenneth Mosman, September 18, 2023