- Home
- Daily Field Report Report ID: 61349
- Edit Download Report
Daily Field Report
Observations/Finding
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to verify compliance with project drawing/specifications, applicable codes, and materials submittals. The following observations were observed on site this day.
The placement and compaction of backfill soils for the storm trench between MH15 and MH16 and for Retaining wall B, continued this day.
At the time of arrival, our representative observed that work was in progress for the storm trench with approximately one (1) foot lifts being placed at finished grade and compacted using a C5P734 compactor and for retaining wall B using an 11-ton sheepsfoot compactor.
Density test results indicate that the compacted materials met the project requirement of 95% for retaining wall B, and 90% for the storm trench.