Daily Field Report
Observations/Finding
As requested, our ASEC representative was on site to observe the installation of Retaining Wall B. The following were observed:
- Introduction:
This report provides an overview of the construction process and key details regarding the welded wire basket retaining wall at [Carodel Farm@Union Charch Rd]. The purpose of this report is to document the construction methods, materials used, and quality control measures employed during the construction of the welded wire basket retaining wall.
- Construction Details:
The retaining wall utilized welded wire baskets, each measuring approximately 18” x 18”. These baskets appeared to be installed in accordance with the project design drawings. The reinforced zone behind the wire baskets extended to a distance of approximately 18 feet, as specified in the project design. The backfill soil was placed in layers of 8 to 10 inches and compacted using a pad foot roller.
- Construction Process:
The construction process involved the following steps:
- Welded Wire Basket Installation:
- Reinforcement and Backfill Placement:
The reinforced zone behind the wire baskets extended to approximately 18 feet. Backfill soil was placed in layers of 8 to 10 inches then compacted using a pad foot roller.
- Quality Control Measures:
To verify the quality and stability of the welded wire basket retaining wall, the following measures were undertaken:
- Testing:
The backfill soil compaction was tested using a nuclear density gauge. General probing using a 3/8″ diameter probe rod was also conducted to verify stability.
- Conclusion:
The construction of the welded wire basket retaining wall B at [Carodel Farm@Union Charch Rd] appeared to be installed in accordance with the project design drawings and specifications.
For further information or inquiries, please contact [404-322-8501].