- Home
- Daily Field Report Report ID: 61208
- Edit Download Report
Daily Field Report
Date :08/30/2023
Project No :2023C159
Client Company :CW Matthews
Arrival Time :08/30/2023 7:30
Onsite Hours :06:00
Name of the Project :Airfield Repairs 2021-23
Project Location :HJAIA, Atlanta, GA
Weather :cloudy
Departure Time :08/30/2023 13:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- A pre-pour observation was performed in the Airfield repair, Ramp 6 N, Storm drains portions of the project this day. The contractor completed rebar and dowel placement for these repair locations.
- The writer visually inspected the installation and setup of these Storm drains and advised the contractor representatives of any minor corrections that were required.
- Contractor cleaned loose rock and debris from the base.
- Our representative along with Selim of 2MNEXT and the ATLNex representative and CWM Rep Tim signed the pre-pour card.
- and also sampled and observed the placement of concrete for Storm drains repairs.
Technician Signature / DateAminullah Azimi, August 30, 2023
Reviewer Name / DateRamchandra Mogulla, September 05, 2023