- Home
- Daily Field Report Report ID: 60779
- Edit Download Report
Daily Field Report
Date :08/11/2023
Project No :2023C156
Client Company :CWM
Arrival Time :08/11/2023 6:30
Onsite Hours :03:00
Name of the Project :Modern Cargo Expansion, Gate 70 - 2a and 2b
Project Location :HJAIA
Weather :sunny
Departure Time :08/11/2023 9:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- A pre-pour observation was performed in the Cargo expansion line 25, portions of the project this day. The contractor completed rebar and dowel basket placement for these lanes.
- The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were required.
- Contractor cleaned loose rock and debris and puddles of water from the base.
- Baskets were found to be level and straight and secured.
- Dowel bars have epoxy. Embedment depth into the concrete was found to be 15 inches.
- Our representative along with Kenny of 2MNext QA and the ATLNext representative Mark and CWM rep Brandon signed the pre-pour card.
Technician Signature / DateAminullah Azimi, August 11, 2023
Reviewer Name / DateRamchandra Mogulla, September 05, 2023