Skip to content

Density Test Report

Date :08/01/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :08/01/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :08/01/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
08/01/2023 1 16.2 105.3 43409 107.5 17.8 98.0 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :271
Comment : Gauge Serial No. :30942
08/01/2023 2 14.8 106.0 43409 107.5 17.8 98.6 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :264
Comment : Gauge Serial No. :30942
08/01/2023 3 16.9 105.8 43409 107.5 17.8 98.4 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :266
Comment : Gauge Serial No. :30942
08/01/2023 4 16.9 105.6 43409 107.5 17.8 Check
Location : Section 2 basement area G7, Elv/Depth :266
Comment :
Technician Signature / DateAvinash Bandham, August 1, 2023
Reviewer Name / DateRamchandra Mogulla, August 07, 2023