- Home
- Daily Field Report Report ID: 60445
- Edit Download Report
Daily Field Report
Date :07/21/2023
Project No :2022C227
Client Company :Artisan
Arrival Time :07/21/2023 7:30
Onsite Hours :9:15
Name of the Project :Riverwalk Manor (CMT) Unit 2, PH 4E and 4F
Project Location :Dallas
Weather :sunny
Departure Time :07/21/2023 16:45
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
Our representative the drilling of rock and documented the results. Results are attached in a separate report.
Technician Signature / DateAminullah Azimi, July 21, 2023
Reviewer Name / DateKenneth Mosman, July 30, 2023