Date :07/21/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/21/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :07/21/2023 16:30
ASEC Technician Name :Avinash Bandham
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (Reference drawing E720661 S1 – R8, E720659 S1-R8.)
During the visit, the following observations were made:
- Two thousand three hundred and ninety-four (2394) cubic yards of fill materials were placed for lift (21) in section 2 part 2 basement area G7 (E720659 S1-R8). The materials were placed and compacted in accordance with ITP-001, and the fill area is highlighted in brown as depicted in the attached drawing.
- The area was probed using the hand probe and performed three moisture density tests in section 1 and section 2 and verified with a check-plug.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
The fill materials placed in section basement area G7
The fill materials placed in section basement area G7
The highlighted region shows the placement of fill materials
Technician Signature / DateAvinash Bandham, July 21, 2023