Skip to content

Density Test Report

Date :07/21/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :07/21/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :Cloudy
Departure Time :07/21/2023 16:30
ASEC Technician Name :Avinash Bandham

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
07/21/2023 4 17.9 104.2 46268 105.1 18.6 Check
Location : Section 1 basement area B7, Elv/Depth :266
Comment :
07/21/2023 1 18.0 107.9 46268 105.1 18.6 102.7 90 D6938 Pass
Location : Section 1 basement area B7, Elv/Depth :266
Comment : Gauge Serial No. :30942
07/21/2023 2 17.6 103.9 46268 105.1 18.6 98.9 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :261
Comment : Gauge Serial No. :30942
07/21/2023 3 17.8 104.2 46268 105.1 18.6 99.1 90 D6938 Pass
Location : Section 2 basement area G7, Elv/Depth :261
Comment : Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, July 21, 2023
Reviewer Name / DateRamchandra Mogulla, July 31, 2023