Daily Field Report
Date :07/12/2023
Project No :2023C136
Client Company :Excellere
Arrival Time :07/12/2023 12:00
Onsite Hours :03:00
Name of the Project :Big Creek Boardwalks
Project Location :Alpharetta
Weather :cloudy
Departure Time :07/12/2023 15:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
Our representative was on site to observed the drilling and installation of Helical piles. Following a standby period of 3 hours, the contractor cancelled work this day.
Technician Signature / DateAminullah Azimi, July 12, 2023
Reviewer Name / DateKenneth Mosman, July 19, 2023