Date :07/11/2023
Project No :2023C136
Client Company :Excellere
Arrival Time :07/11/2023 8:00
Onsite Hours :9:30
Name of the Project :Big Creek Boardwalks
Project Location :Alpharetta
Weather :sunny
Departure Time :07/11/2023 17:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
Our representative performed the observation and documentation of drilling and installation of Helical piles this day. Results are attached in a final report.
Technician Signature / DateAminullah Azimi, July 11, 2023
Reviewer Name / DateKenneth Mosman, July 19, 2023