Daily Field Report
Date :06/26/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :06/26/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :06/26/2023 16:30
ASEC Technician Name :Avinash Bandham
Observations/Finding
AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Avinash Bandam visited the site at the request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to monitor, verify and document the ongoing project activities. (reference drawing E720661 S1 – R8, E720659 S1-R8.)
During the visit, the following observations were made:
- One thousand eight hundred and ninety (1890) cubic yards of fill materials were placed for lift (17) in section 1 area B7 (E720661 S1-R8). The materials were placed and compacted in accordance with ITP-001, and the fill area is highlighted in brown as depicted in the attached drawing.
- The area was probed with a hand probe and three moisture density tests and check plug were performed in the section 1 and section 2 basement area B7 and G7,and verified the compaction results in accordance with Proctor curves. The attached drawings depicts the approximate test locations.
We appreciate the opportunity to be of service to you on this project. If you have any questions regarding this report, please feel free to contact us. We will be more than happy to discuss it with you.
Technician Signature / DateAvinash Bandham, June 26, 2023