- Home
- Daily Field Report Report ID: 59933
- Edit Download Report
Daily Field Report
Date :06/24/2023
Project No :2022C106
Client Company :CWM
Arrival Time :06/24/2023 11:00
Onsite Hours :06:00
Name of the Project :Taxiway 2022 Pavement Replacement
Project Location :HJAIA
Weather :sunny
Departure Time :06/24/2023 17:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- Performed logger reading for lane 5, lane 7 and lane 9.
- Was to observe a proof-roll for the shoulder at west of phase 1A, lane 1, however, it was later canceled for the day.
Technician Signature / DateAminullah Azimi, June 24, 2023
Reviewer Name / DateKenneth Mosman, July 09, 2023