Skip to content

Density Test Report

Date :06/20/2023
Project No :2022C113
Client Company :CWM
Arrival Time :06/20/2023 8:30
Onsite Hours :07:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :06/20/2023 15:30
ASEC Technician Name :Aminullah Azimi

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
06/20/2023 1 8.1 138.7 Recycled GAB 134.9 8.7 95.1 95 D6938 Pass
Location : 11 feet to west of propose MH#1, Elv/Depth :at finished grade
Comment : Gauge Serial No. :85759
06/20/2023 2 10.1 114.0 23347 119.7 13.0 95.2 90 D6938 Pass
Location : at Jock and Pit., Elv/Depth :3 feet below finished grade
Comment : Gauge Serial No. :85759
Technician Signature / DateAminullah Azimi, June 20, 2023
Reviewer Name / DateKenneth Mosman, July 09, 2023