Daily Field Report
Date :05/15/2023
Project No :2022C178
Client Company :CW Matthews
Arrival Time :05/15/2023 8:00
Onsite Hours :08:00
Name of the Project :Ramp 2 Pavement Replacement
Project Location :HJAIA
Weather :rainy
Departure Time :05/15/2023 16:00
ASEC Technician Name :Aminullah Azimi
Observations/Finding
At the request of the client’s representative, AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe and monitor the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications. The following observations were made on site this shift:
- Work was being performed in the Ramp 2 – Phase 4 and sewer enhancements of the project on this day.
- Performed concrete coring and filling and logger reading for Ramp 2 – Phase 4.
- Our representative, along with Depto of ATLQA and ATLNext representative Hazim and CWM rep Brandon observed the process.
- In addition, our ASEC representative observed straight edge testing of Ramp 2 – Phase 4.
- Also observed the installation of pipe between MH#3 and MH#9 and contractor installation of MH#3. GAB compaction was not ready for testing today.
Technician Signature / DateAminullah Azimi, May 15, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023