Skip to content

Daily Field Report

Date :05/12/2023
Project No :2022C113
Client Company :CWM
Arrival Time :05/12/2023 8:00
Onsite Hours :08:00
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :rainy
Departure Time :05/12/2023 16:00
ASEC Technician Name :Aminullah Azimi

Observations/Finding

At the request of the client’s representative, our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative, Amin Azimi visited the job site to observe the contractor’s work activities from a quality standpoint to assure compliance with project drawings/specifications, applicable codes, and materials submittals and conducted QC testing per the project drawings and specifications.  The following observations were made on site this shift:

  • Pre-pour observation performed in the Ramp 2, Lane 1 and lane 3 portions of the project on this day. Contractor completed rebar and dowel basket placement for these lanes.
  • The writer visually inspected the installation and setup of these lanes and advised the contractor representatives of any minor corrections that were needed.
  • The contractor cleaned out loose rock and debris.
  • Baskets were found to be level, straight and secured.
  • Dowel bars were found to have epoxy.  Embedment length was found to be 15 inches into concrete.
  • The writer along with Josi of ATLQA and ATLNext representative Hazim and CWM rep Brandon signed the pre-pour card.
  • At the time of arrival, work was in progress for manhole installation this day.

Technician Signature / DateAminullah Azimi, May 12, 2023
Reviewer Name / DateKenneth Mosman, July 08, 2023