Daily Field Report

Date :04/26/2023
Project No :2022C113
Client Company :CWM
Arrival Time :04/26/2023
Onsite Hours :
Name of the Project :Airfield Sewer Enhancements
Project Location :HJAIA
Weather :cloudy
Departure Time :04/26/2023
ASEC Technician Name :Russell Hendrix

Observations/Finding

As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative noted above, for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications.

A request was made by CW Matthews for Nuclear compaction testing for the top lift on the Sewer Enhancement project.  Placement of lifts for graded aggregate base (GAB) or soil was not observed.

Upon arrival it was determined that the top layer of GAB was contaminated with Soil (see photo).  No testing could be conducted.  This information was passed on to foreman at R-C and CW Matthews.

Technician Signature / DateRussell Hendrix, April 26, 2023
Reviewer Name / DateRamchandra Mogulla, June 06, 2023