Skip to content

Density Test Report

Date :04/12/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :04/12/2023 06:00
Onsite Hours :10:30
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :SUNNY
Departure Time :04/12/2023 16:30
ASEC Technician Name :Vidal Dias

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
04/12/2023 1 15.3 112.5 ASEC-2 110.9 15.3 101.4 90 D6938 Pass
Location : Section -2 basement are B7, Elv/Depth :243.5
Comment : Moisture density test has been conducted at Section -2 basement area B7 which is at 238 ft from the North end wall. Gauge Serial No. :30942
04/12/2023 2 15.5 110.3 ASEC-2 110.9 15.3 99.5 90 D6938 Pass
Location : Section-1 B7, Elv/Depth :252.91
Comment : Moisture density test has been conducted at Section -1 basement area B7 which is at 130 ft from the North end wall. Gauge Serial No. :30942
04/11/2023 1 13.7 115.4 ASEC-2 110.9 15.3 104.1 90 D6938 Pass
Location : Section-1 basement area B7, Elv/Depth :252.24
Comment : Moisture density test has been conducted at Section -1 basement area B7 which is at 30 feet from ramp center. 60 feet from north wall. Gauge Serial No. :30942
04/11/2023 2 14.7 115.7 ASEC-2 110.9 15.3 104.3 90 D6938 Pass
Location : Section-1 basement area B7, Elv/Depth :252.24
Comment : Moisture density test has been conducted at Section -1 basement area B7 which is at Location 80 feet from ramp center Gauge Serial No. :30942
Technician Signature / DateAvinash Bandham, April 12, 2023
Reviewer Name / DateVidal Dias, April 13, 2023