Density Test Report
Date :04/06/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :04/06/2023 6:30
Onsite Hours :05:00
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :cloudy
Departure Time :04/06/2023 11:30
ASEC Technician Name :Aminullah Azimi
Observations/Finding
Test Date | Test Number | Moisture Content (%) | Dry Density (pcf) | Proctor Number | Max. Dry Density (pcf) | Optimum Moisture (%) | Compaction (%) | Specified Compaction (%) | ASTM Test Method | Pass/Fail |
---|---|---|---|---|---|---|---|---|---|---|
04/06/2023 | 1 | 0.0 | NaN | D6938 | Pass | |||||
Location : | Fiber vault #2, Elv/Depth :at finished grade | |||||||||
Comment : | Duct bank cover. Compaction testing not required. | Gauge Serial No. :85759 | ||||||||
04/06/2023 | 2 | 0.0 | NaN | D6938 | Pass | |||||
Location : | Fiber vault #2, Elv/Depth :at finished grade | |||||||||
Comment : | Duct bank cover. Compaction testing not required. | Gauge Serial No. :85759 | ||||||||
04/06/2023 | 3 | 0.0 | NaN | D6938 | Pass | |||||
Location : | Duct line East of vault#2, Elv/Depth :at finished grade | |||||||||
Comment : | Duct bank cover. Compaction testing not required. | Gauge Serial No. :85759 |
Technician Signature / DateAminullah Azimi, April 6, 2023
Reviewer Name / DateKenneth Mosman, September 18, 2023