Skip to content

Density Test Report

Date :03/04/2023
Project No :2023C111
Client Company :2MATL
Arrival Time :
Onsite Hours :
Name of the Project :DOA Fiber Infrastructure Improvements
Project Location :HJAIA
Weather :Sunny
Departure Time :03/04/2023
ASEC Technician Name :Russell Hendrix

Observations/Finding

Test Date Test Number Moisture Content (%) Dry Density (pcf) Proctor Number Max. Dry Density (pcf) Optimum Moisture (%) Compaction (%) Specified Compaction (%) ASTM Test Method Pass/Fail
03/04/2023 1 8.2 97.7 M10 119.0 11.4 82.1 90 D6938 Fail
Location : 80 feet South of A3D, Elv/Depth :First Lift
Comment : Additional compactive effort requested and observed Gauge Serial No. :38069
03/04/2023 2 6.3 104.0 M10 119.0 11.4 87.4 90 D6938 Fail
Location : 60 feet South of A3D, Elv/Depth :Retest of Test 1
Comment : Water added and recompaction Gauge Serial No. :38069
03/04/2023 3 14.3 110.0 M10 119.0 11.4 92.4 90 D6938 Pass
Location : 70 feet South of A3D, Elv/Depth :Retest of Test 1
Comment : Gauge Serial No. :38069
03/04/2023 4 6.6 108.9 M10 119.0 11.4 91.5 90 D6938 Pass
Location : 65 feet South of A3D, Elv/Depth :Second Lift
Comment : Low moisture content. Water added, recompacted and retested Gauge Serial No. :38069
03/04/2023 5 10.9 110.7 M10 119.0 11.4 93.0 D6938 Pass
Location : 75 feet south of A3D, Elv/Depth :Retest of Test #2
Comment : Gauge Serial No. :38069
03/04/2023 6 7.2 106.0 M10 119.0 11.4 89.1 90 D6938 Fail
Location : 80 feet south of A3D, Elv/Depth :-6 inches below finished grade
Comment : Water added, recompacted and retested Gauge Serial No. :38069
03/04/2023 7 10.7 110.6 M10 119.0 11.4 92.9 90 D6938 Pass
Location : 70 feet south of A3D, Elv/Depth :Retest of Test #6
Comment : Gauge Serial No. :38069
Technician Signature / DateKenneth Mosman, March 4, 2023
Reviewer Name / DateRamchandra Mogulla, April 06, 2023