Daily Field Report

Date :03/29/2023
Project No :2021C060
Client Company :Pulte Group
Arrival Time :03/29/2023 17:30
Onsite Hours :03:30
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :Sunny/Humid
Departure Time :03/29/2023 21:00
ASEC Technician Name :Isaac Davis

Observations/Finding

Our AS Engineering & Consulting, LLC representative was on site to visually inspect the footings for the following residential lots:

Lot #72 Pod13 and Lot #76 Pod13

Foundation requirement = 2000 psf

L72P13F (Northside) SFB=11 blows

Depth = 1 foot = Light brown/red sandy silt-17 blows

Depth = 2 feet = ”                        “-15 blows

Depth = 3 feet = Brown sandy silt mica-16 blows

Depth = 4 feet = ”                      “-15 blows

L72P13B (Southside) SB=10 blows

Depth = 1 foot = hit rock @ depth of 6″

1 Offset

Depth = 1 foot =Brown sandy silt mica-13 blows

Depth = 2 feet = ”                  “-15 blows

Depth = 3 feet = Light/Dark brown sandy silt mica-14 blows

Depth = 4 feet = ”                   “-12.5 blows

Two (2) sections of the footings were found to display soft soils in a 1-foot section.

In-place rebar was found to meet job specifications for size, spacing and quantity.

 

L76P13F (northside) SB=11 blows

Depth = 1 foot = Red sandy silt Mica-16 blows

Depth = 2 feet = ”          “-19 blows

Depth = 3 feet = ”           “-18 blows

Depth = 4 feet = Brown sandy silt mica-18 blows

 

L76P13B (southside) SB=9 blows

Depth = 1 foot = White/Red sandy silt Mica-16 blows

Depth = 2 feet = White/light brown/purple sandy silt Mica-14 blows

Depth = 3 feet = Light brown sandy silt Mica-13 blows

Depth = 4 feet = ”                                                “-11 blows

In-place rebar was found to meet job specifications for size, spacing and quantity.

Note: adjacent neighbor’s sprinkler system was spraying over onto Lot #72 Pod13.

 

 

 

 

Technician Signature / DateIsaac Davis, March 29, 2023
Reviewer Name / DateKenneth Mosman, April 02, 2023