Skip to content

Daily Field Report

Date :02/09/2023
Project No :2022C235
Client Company :Jackson Demolition Service, Inc.
Arrival Time :02/09/2023 06:00
Onsite Hours :10:00
Name of the Project :Plant Gorgas Demolition and Grading
Project Location :460 Gorgas Rd, Parrish, AL 35580
Weather :
Departure Time :02/09/2023 16:00
ASEC Technician Name :Vidal Dias

Observations/Finding

Our AS ENGINEERING AND CONSULTING, LLC (ASEC) representative Vidal Dias visited the site at the
request of Jackson Demolition representative Josh Kelly. The undersigned representative was present to
observe, verify and document the ongoing project activities.
During the visit, the following observations were made:

  • The contractor installed 1024.14 tons of No. 24 stone over the previously prepared Terragrid textile layer in the lower half of the basement area G8.
  • The No. 24 stone was placed according to the job specifications shown on drawing sheet E720667.

Photo documentation is included below:

825B stone placed on east bakers creek wall.

825 B stone placement in area G7

825B stone placed to grade in G7

825B stone as seen from bakers creek wall

Technician Signature / DateVidal Dias, February 9, 2023
Reviewer Name / DateKenneth Mosman, February 10, 2023