Concrete Test Report
Date :01/13/2023
Project No :2022C174
Client Company :CWM
Arrival Time :01/13/2023
Onsite Hours :
Name of the Project :CWM Plant on Mulberry Rock Road
Project Location :Dallas, Paulding County
Weather :cloudy
Departure Time :01/13/2023
ASEC Technician Name :Russell Hendrix
Concrete Placement Information
Location(S):
Testing:
1 Set of concrete specimens (4 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: 1 Sets of concrete cylinders/ 4 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: 1 Sets of concrete cylinders/ 4 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
As requested, the site was visited by our AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services, visual observation techniques were employed to assure compliance with project drawing/specifications, applicable codes, and materials submittals. the following observations were observed on site this day.
No concrete specifications were provided. All information was provided to Mr. Scott Hamilton and the site foreman. Cylinders were stored overnight in a heated work trailer and delivered to the CW Matthews airport lab. A total of 4 slabs were poured today.
Field Test Data
Set Number :69 yards
Date Sampled :01/13/2023
Sampled By :Russell Hendrix
Contractor :CW Matthews
Truck Number :7
Time Batched :11:01
Location of Placement :four (4) slabs
Number of samples cast :4
Ambient Temperature (°f) :40
Slump (in.) :4
Water added (gal.) :
Laboratory Number :
Time Sampled :12:00
Weather Condition :cloudy
Concrete Supplier :WDC
Mix ID :50c91
Quantity of Load (cu. yd.) :9
Sample Cast :1
Specified Strength :5000
Concrete Temperature(°f) :60
Air Content (%) :5.0
Strength Test Results
Specimen Number | Age (days) | Date Tested | Dia(in.) | Area (sq in.) | Maximum Loads (lbs) | Strength (lbs) | % Design Strength | Type of Fracture |
---|
UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER.
(Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed
Technician Signature / DateRussell Hendrix, January 13, 2023
Reviewer Name / DateKenneth Mosman, March 06, 2023