- Home
- Concrete Test Report Report ID: 55828
- This project is inactive from admin.Download Report
Concrete Test Report
Date :12/16/2022
Project No :2022C182
Client Company :Excellere
Arrival Time :12/16/2022 8:00
Onsite Hours :04:00
Name of the Project :Eastside Trolley Trail
Project Location :Atlanta
Weather :Sunny
Departure Time :12/16/2022 12:00
ASEC Technician Name :Aminullah Azimi
Concrete Placement Information
Location(S):
Testing:
A Set of concrete specimens (6 Cylinders per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing.
Compliance:
Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) (refer to remarks below)
Deviations and/or noncompliances were noted during the field placement (refer to remarks below)
Cylinders
Pick Up: A Sets of concrete cylinders/ 6 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Pick Up: A Sets of concrete cylinders/ 6 cylinders per set were picked up & transported to AS Engineering and Consulting LLC (ASEC) for curing and testing in accordance with ASTM C39, C670/1231
Field Curing:
Cylinders were stored for the initial 24 hours
Near the poured structure
In an insulated curing box
Other
Remarks:
Our ASEC representative arrived on site as requested.
The placement of 7.5 cubic yards of GA DOT CL-A concrete for curbing was performed between Stations 25+00 and 26+00.
A batch to placement time of less than 90 minutes was achieved. Concrete temperatures ranged from 80 to 90-degree Fahrenheit.
Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time,
The following samples were obtained for compressive strength testing in our laboratory:
Set A:
1 Set of 6 lab cylinders Claas A (for curbing placed on December 16, 2022).
Technician Signature / DateAminullah Azimi, December 16, 2022
Reviewer Name / DateRamchandra Mogulla, February 22, 2023