Date :04/21/2022
Project No :2020C007
Client Company :Pulte Group
Arrival Time :04/21/2022 07:00
Onsite Hours :01:30
Name of the Project :Winslow at Brookstone
Project Location :6156 Collins Road, Acworth, GA 30101
Weather :
Departure Time :04/21/2022 08:30
ASEC Technician Name :Jamal Geathers

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals.

Our ASEC representative performed foundation bearing tests in the below referenced footing areas.  All referenced footings were found to meet the job specification for a soil bearing pressure of 2,000 psf.

A reinforcing steel inspection was performed on the following locations: (Lots #44 & 45).  Reinforcing steel was observed to meet job specifications for required size, spacing, and quantity. No discrepancies were noted.

If foundation soils become wet prior to concrete placement, they should be reevaluated by a geotechnical engineer or qualified soils technician. All soft or wet soils or debris should be removed from foundations prior to concrete placement.

 

DCP LOCATION:
Lot #, North/South/Center etc
45 DCP LOCATION:
Lot #, North/South/Center etc
44
Depth
(feet)
Set
2″
N
1.75″
Description Depth
(feet)
Set
2″
N
1.75″
Description
1 5 8 1 5 17
2 5 11 2 5 11
3 5 9 3 5 AR
4 5 10 4
Technician Signature / DateJamal Geathers, April 21, 2022