Daily Field Report

Date :02/09/2022
Project No :2021C058
Client Company :Pulte Group
Arrival Time :02/09/2022 04:00
Onsite Hours :03:00
Name of the Project :Parkside at Mason Mill
Project Location :Decatur, GA
Weather :
Departure Time :02/09/2022 07:00
ASEC Technician Name :Jamal Geathers

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to verify compliance with project drawings/specifications, applicable codes, and materials submittals.

Our ASEC representative performed foundation bearing tests in the below referenced footing areas.  All referenced footings were found to meet the job specifications for a soil bearing pressure of 2,000 psf.

A visual reinforcing steel inspection was performed on the following locations: (Lots #141).  Reinforcing steel was observed to meet job specifications for required size, spacing, and quantity. Discrepancies were noted. * Finish taping vapor barrier seams and finish rebar tying.

If foundation soils become soft and/or wet prior to concrete placement, they should be reevaluated by a geotechnical engineer or qualified soils technician. All loose fall-in soils or debris should be removed from foundations prior to concrete placement.

Depth
(feet)
Set
2″
N
1.75″
1 4 12
2 4 8
3 4 11
4 4 10
Technician Signature / DateJamal Geathers, February 9, 2022
Reviewer Name / DateKenneth Mosman, July 03, 2022