Daily Field Report

Date :03/31/2022
Project No :2021C060
Client Company :Pulte Group
Arrival Time :03/24/2022
Onsite Hours :
Name of the Project :Suncity - Peachtree
Project Location :Griffin, GA
Weather :70 sunny
Departure Time :03/24/2022
ASEC Technician Name :Russell Hendrix

Observations/Finding

The site was visited by the undersigned AS Engineering and Consulting (ASEC) representative for the purpose of providing quality control inspection and testing services. Visual observation techniques were employed to assure compliance with project drawings/specifications, applicable codes, and materials submittals. The following observations were made on site today:

A request was made for a footing inspection for Lots #34 Pod #17.  All rebar was placed as per job specifications for size, quantity, and spacing.  The footing probed firm with a 3/8-inch rod.  Please see the attached table.

DCP TEST DATA SHEET
                         
Project Name: Suncity   Date: 03/24/22
Project Number: 2021c060   Technician: Russ Hendrix
Project Location: Griffin
     
                         
DCP LOCATION:
Lot #, North/South/Center etc
Lot 34/pod 17 footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1   13 Red fine sandy silt   1   AR Red fine sandy silt
2   AR     2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
                         
DCP LOCATION:
Lot #, North/South/Center etc
off set, back center of footing   DCP LOCATION:
Lot #, North/South/Center etc
 
     
                         
Depth
(feet)
Set
2″
N
1.75″
Description   Depth
(feet)
Set
2″
N
1.75″
Description
1         1      
2         2      
3         3      
4         4      
5         5      
6         6      
7         7      
8         8      
9         9      
10         10      
                         
NOTES:  
 
 
Technician Signature / DateRussell Hendrix, March 31, 2022
Reviewer Name / DateKenneth Mosman, April 02, 2022